Special Consular Reports, Nide 3U.S. Government Printing Office, 1891 |
Kirjan sisältä
Tulokset 1 - 5 kokonaismäärästä 100
Sivu 4
... covering . After numerous experiments with other systems of keeping the roads , which have always failed , the above ... covered with ballast up to their normal height . This work is as much as possible carried out in wet weather , as a ...
... covering . After numerous experiments with other systems of keeping the roads , which have always failed , the above ... covered with ballast up to their normal height . This work is as much as possible carried out in wet weather , as a ...
Sivu 9
... covering layer of ballast must be 0.1 to 0.13 metre , which is again to be covered by a layer of sand of 0.03 to 0.05 metre . Bottom width of the road ditch 0.47 metre , convexity of the road surface 0.13 to 0.16 , with a width of road ...
... covering layer of ballast must be 0.1 to 0.13 metre , which is again to be covered by a layer of sand of 0.03 to 0.05 metre . Bottom width of the road ditch 0.47 metre , convexity of the road surface 0.13 to 0.16 , with a width of road ...
Sivu 10
... covered , fall to the respective districts , which as a rule are identical with the court districts . The raising of the necessary money is pre- scribed to the different communities of the district in proportion to their direct taxes ...
... covered , fall to the respective districts , which as a rule are identical with the court districts . The raising of the necessary money is pre- scribed to the different communities of the district in proportion to their direct taxes ...
Sivu 12
... covered with ballast , 1,608,559 square metres , or 82 per cent . , belong to roadways , squares , etc. , and 345,743 square metres , or 18 per cent . , to walks and riding paths . Besides the paved surface enumerated there are still of ...
... covered with ballast , 1,608,559 square metres , or 82 per cent . , belong to roadways , squares , etc. , and 345,743 square metres , or 18 per cent . , to walks and riding paths . Besides the paved surface enumerated there are still of ...
Sivu 17
... covered by it at that time . In 1874 the law was changed as follows : For the expense of sewers 12 francs per ... covering both sides . Every six months a map is drawn up for the purpose of showing what new build- ings have been erected ...
... covered by it at that time . In 1874 the law was changed as follows : For the expense of sewers 12 francs per ... covering both sides . Every six months a map is drawn up for the purpose of showing what new build- ings have been erected ...
Muita painoksia - Näytä kaikki
Yleiset termit ja lausekkeet
12 inches amount asphalt average blocks brick bridges broken stone building built Cannon street carriage carts centimes centimetres cents city streets clean condition construction contractor cost country roads cubic metre cubic yard curbs depth district ditches drains engineer excavation expense feet filled francs Gracechurch street gradient granite gravel grouted heavy traffic highways horses inches inches deep inches thick joints kilometres King William street labor laid land layer length less lime limestone Lower Austria macadamized macadamized roads maintenance marks per square material ment metal miles mortar municipal necessary parish paving stones pipes placed porphyry Portland cement province public roads quarries repair REPORT BY CONSUL roadway rock rolled sand sets sewers side sidewalks slippery square metre square yard steam roller superficial yard surface surveyor tion towns trees UNITED STATES CONSULATE Val de Travers vehicles weather width wood pavement