Special Consular Reports, Nide 3U.S. Government Printing Office, 1891 |
Kirjan sisältä
Tulokset 1 - 5 kokonaismäärästä 100
Sivu 4
... present day , with a short interruption in the years 1858-1861 , during which time the keeping of the roads was again contracted for by way of experiment , which again gave but unsatisfac- tory results . For the immediate carrying out ...
... present day , with a short interruption in the years 1858-1861 , during which time the keeping of the roads was again contracted for by way of experiment , which again gave but unsatisfac- tory results . For the immediate carrying out ...
Sivu 17
... present rules and in accord with the authorities designated in the legal rules upon the matter ) with the service of the district roads , of the works of hygiene , and of the water courses not navigable . The rules and regulations ...
... present rules and in accord with the authorities designated in the legal rules upon the matter ) with the service of the district roads , of the works of hygiene , and of the water courses not navigable . The rules and regulations ...
Sivu 18
... present undertaking is the execution by contract of the sewers and pavement of the above - mentioned street , also a water connection with the canal Herenthals . The work in general shall be executed in accordance with the indications ...
... present undertaking is the execution by contract of the sewers and pavement of the above - mentioned street , also a water connection with the canal Herenthals . The work in general shall be executed in accordance with the indications ...
Sivu 19
... present a regular curve . The supports of the centerings shall be placed at a distance of 70 centimetres from axis to axis . The extrados of the superior arch shall be covered with 1 centimetre's thickness of hydraulic or common mortar ...
... present a regular curve . The supports of the centerings shall be placed at a distance of 70 centimetres from axis to axis . The extrados of the superior arch shall be covered with 1 centimetre's thickness of hydraulic or common mortar ...
Sivu 25
... material . The material rejected must be immediately removed from the works and replaced by others , and that before the resumption of work . * 1 ARTICLE 13 . General conditions . The present enterprise constitutes 7 ...
... material . The material rejected must be immediately removed from the works and replaced by others , and that before the resumption of work . * 1 ARTICLE 13 . General conditions . The present enterprise constitutes 7 ...
Muita painoksia - Näytä kaikki
Yleiset termit ja lausekkeet
12 inches amount asphalt average blocks brick bridges broken stone building built Cannon street carriage carts centimes centimetres cents city streets clean condition construction contractor cost country roads cubic metre cubic yard curbs depth district ditches drains engineer excavation expense feet filled francs Gracechurch street gradient granite gravel grouted heavy traffic highways horses inches inches deep inches thick joints kilometres King William street labor laid land layer length less lime limestone Lower Austria macadamized macadamized roads maintenance marks per square material ment metal miles mortar municipal necessary parish paving stones pipes placed porphyry Portland cement province public roads quarries repair REPORT BY CONSUL roadway rock rolled sand sets sewers side sidewalks slippery square metre square yard steam roller superficial yard surface surveyor tion towns trees UNITED STATES CONSULATE Val de Travers vehicles weather width wood pavement