Parliamentary Papers, Nide 17H.M. Stationery Office, 1962 |
Kirjan sisältä
Tulokset 1 - 3 kokonaismäärästä 26
Sivu 44
... transmission network and where a transmission line is required exclusively to carry the output from that station into the network , the annual capital charges and the annual cost of operation and maintenance on that line should be ...
... transmission network and where a transmission line is required exclusively to carry the output from that station into the network , the annual capital charges and the annual cost of operation and maintenance on that line should be ...
Sivu 95
... transmission lines to convey the output into the general system , and there will be an increasing need for main switching centres on which transmission lines will converge . It is at such centres that the treatment requires to be ...
... transmission lines to convey the output into the general system , and there will be an increasing need for main switching centres on which transmission lines will converge . It is at such centres that the treatment requires to be ...
Sivu 9
... overhead lines and underground cables , including 61 miles of 275,000 volt lines and 13 miles of 132,000 volt lines . The Secretary of State granted 644 statutory consents to the erection of overhead transmission and distribution lines ...
... overhead lines and underground cables , including 61 miles of 275,000 volt lines and 13 miles of 132,000 volt lines . The Secretary of State granted 644 statutory consents to the erection of overhead transmission and distribution lines ...
Muita painoksia - Näytä kaikki
Yleiset termit ja lausekkeet
31st December Aberdeen accidents amount annual Appendix assets Authority average cable capital cost cent circuit coal Cockenzie Committee compared compartment tank connection construction consumers continued conventional thermal Council Councillor Cruachan Depreciation diesel distribution Dundee economic Electricity Board engineering estimated expenditure explosion Factories Act Fatal Total Fatal figures Fire Brigade Fire Service firedamp Fisheries fuel cost Glasgow haemoglobin hydro-electric ignition increase industry Inspectors installation interest Kilmorack kilowatts Kippering Loans Loch manufacture maximum demand meter million units National Coal Board North Board North of Scotland nuclear Officer organisation output capacity overhead lines paragraph plant load factor power station premises production costs programme pumping Report result return gate revenue safety Scotland District Scotland Electricity Scottish South South of Scotland storage Stornoway substations Tariff thermal efficiency thermal plant Total Fatal Total transmission trawlers vessels voltage volts white fish